- Who is responsible for the planning?
- Alvaro Burgos Cifuentes, M.Sc., a registered member of the Ingenieurkammer-Bau NRW (Nr. 754661), with professional indemnity insurance covering the planning services. Insurance details: see the About page and the legal notice. All calculations and plans are personally reviewed, signed and stamped.
- How long does an infiltration verification actually take?
- We often deliver standard cases within a few working days — counted from the day on which the site plan and soil survey are fully available. More complex cases (hybrid systems where infiltration conditions are poor) take correspondingly longer. Your processing time is stated bindingly in the quote — before you commission.
- What does infiltration planning typically cost?
- Infiltration verifications from €700 net (€833 incl. VAT) for the concept and from €1,500 net (€1,785 incl. VAT) for the full design, the plausibility review of an existing verification €600 net (€714 incl. VAT) — each as a fixed price. Complex constructed wetlands and integrated water concepts fall within the mid to high four-figure range. You will receive the binding fixed price for your property within 24 hours of the initial consultation.
- What happens if my project changes along the way?
- The fixed price always refers to the scope described in the quote. If soil investigations show different conditions than assumed, or you decide on a different concept (say, a constructed wetland instead of a natural pool — a different code then applies), we pause and you receive an updated fixed-price quote within 24 hours. Work already delivered is billed as quoted. You never pay anything that wasn't fixed in writing beforehand. And if the concept turns out not to be feasible: finding that out is exactly what the concept stage is for — you get a reliable, signed answer before you invest in the full design.
- Do you also work outside NRW?
- Our focus is the Niederrhein corridor and NRW as a whole — from our office in the Heinsberg district, the Dutch border region is close by. We also take on projects in the Rhine corridor (Cologne, Düsseldorf, Bonn). Nationwide projects are generally possible, though with a travel-cost share.
- Can you also handle the water authority procedure?
- Yes, optionally. The standard service includes authority-ready documents — submission is handled by the client or architect. On request, we take over direct communication with the responsible water authority, follow-up submissions and queries. This service is billed separately according to effort.
- What performance do your systems actually deliver?
- All of our designs meet the performance requirements of the respective DWA standard — the specific efficiencies (e.g. COD reduction under DWA-A 262, suspended-solids separation under DWA-A 178) are defined in the standards and precisely documented in every planning document. We provide project-specific performance forecasts with source references as part of the planning.
- Do you offer further specialised services?
- Yes — field measurements, funding-application support, cost-effectiveness analyses and project-specific special services are provided by arrangement. We're also happy to discuss process- and wastewater questions for commercial operations — such as food processing, breweries or aquaculture — in the initial call; here we plan according to the relevant DWA guidelines. Simply get in touch if your project has particular requirements.